Feeds:
Posts
Comments

Archive for July, 2014

FOR IMMEDIATE RELEASE

MC900341076[1]

TAMC CONE ZONE REPORT
ROAD AND LANE CLOSURES SCHEDULED FOR JULY 13 –
JULY 20

MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, July 13, through Sunday, July 20, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Big Sur – Carmel: July 13 – July 18
Night time striping and markings replacement along Highway 1 at multiple locations from 7 p.m. to 7 a.m.
The locations are:
Sunday, July 13 – Carmel River Bridge to just north of Garrapata Creek Bridge
Monday, July 14 – Yankee Point Drive/Malpaso Rd. to just south of Hurricane Point
Tuesday, July 15 – Garrapata Creek Bridge to south of Molera Park Entrance
Wednesday, July 16 – South of Bixby Creek Bridge to Grimes Canyon
Thursday, July 17 – North of Molera Park Entrance to Grimes Canyon
Work hours are 7 p.m. to 7 a.m. Monday through Thursday and from 8 p.m. to 7 a.m. on Sundays
Work will result in reversing one-way traffic control.
Motorists can expect delays of approximately 15 minutes.

Highway 1 –South Coast: July 15 – July 18
Daytime work along Highway 1 between Pacific Valley and Vicente Creek Bridge from 8 a.m. to 3 p.m.
Motorists can expect delays of approximately 15 minutes.

Highway 1 – Big Sur: July 17 – July 18
Daytime shoulder work along Highway 1 between the Big Sur Maintenance Station and Garrapata Ridge Road from 9 a.m. to 3 p.m.
Motorists can expect delays of approximately 10 minutes

Highway 1 – Big Sur: July 15
Daytime pavement repair along Highway 1 between the Big Sur State Park Entrance and Hurricane Point from 9 a.m. to 3 p.m.
Motorists can expect delays of approximately 10 minutes

Highway 1 – Monterey: July 16
Daytime bridge work along southbound Highway 1 between Aguajito Road and Iris Canyon Road from 9 a.m. to 2 p.m.
Motorists can expect delays of approximately 10 minutes

Highway 68 – Salinas: July 16
Daytime utility work along westbound Highway 68 / South Main Street between San Joaquin Street and San Miguel Avenue from 9 a.m. to 1 p.m.
Motorists can expect delays of approximately 5 minutes

Highway 101 – Prunedale Improvement Project: July 14 – July 18
Night time construction on Highway 101 will result in the temporary closure of northbound Highway 101 at the Crazy Horse Canyon Road Overpass between the hours of 8:30 p.m. and 5:30 a.m. on Monday, July 14.
Flaggers will be in place to control traffic and allow drivers to access Crazy Horse Canyon Road and Echo Valley Road during the highway closure.
The lane closure is necessary for the first stage of highway paving.
Night work will result in alternating lane closures on northbound and southbound Highway 101 between Blackie Road/Reese Circle and Pesante Road between 7:30 p.m. and 6 a.m.
Night work will result in alternating lane closures on northbound and southbound Highway 101 between Vierra Canyon Road and Crazy Horse Canyon Road between 7:30 p.m. and 6 a.m.
Motorists should expect delays of approximately 10 minutes.

Highway 198 – San Lucas: July 14 – July 18
Daytime pavement work along Highway 198 between the Fresno County Line and Highway 25 from 8 a.m. to 3:30 p.m.
Motorists can expect delays of approximately 10 minutes

Castroville Boulevard: Castroville – Prunedale: July 14 – July 28
Daytime grinding and paving along Castroville Boulevard between Highway 156 and San Miguel Canyon Road from 7 a.m. to 5 p.m.
There will be one lane traffic control with pilot car for about 1 to 1.5 mile sections each day.
Motorists can expect delays and are strongly encouraged to use alternate routes.

Advertisements

Read Full Post »